Operations controls
Control room dashboard
This is a simplified learning model, not official Dubai transport data. Real tram planning needs safety rules, timetables, accessibility, signalling, staff, maintenance, and passenger research.
Arabic station phrase builder
Challenge missions
Mission 1: Cut crowding
Lower the headway by 2 minutes. Does the comfort score improve enough to justify the extra cost?
Mission 2: Protect profit
Raise reliability spending by AED 500/hour and find a fare or fleet setting that keeps profit positive.
Mission 3: Event surge
Switch to evening event surge. How many trams are needed before average load falls below 85%?
Mission 4: Explain in Arabic
Use the phrase cards to make a polite passenger update about crowding or the next tram.